175 Telok Ayer Street 250Amp Main Switch Board Upgrade

175 Telok Ayer Street project comprised of the Main Switch Board upgrading to 250Amp. This involved cooperation with Singapore Power Grid to provide the upgraded cabling works from the next available OG box. Our team worked with the cable detection team to check that the earthing cabling does not inadvertently damage concealed underground pipes and cables. This project required specific electrical expertise involving our team of technicians, the Licensed Professional Engineer (EMA Grade 9) and Power Grid. 

Have a look at the gallery:

Why Us?

Our Electricians are:

Scroll to Top